On March 10th 2019, AIChE ITS SC held a second workshop of Professional Engineering Month (PEM). This event is supported by Pt. PUSTEK E&T, ALTEKIMITS, and BKKPII. The Subtheme is “Feasibility Study”. We invited Mr. Dimas Eko Prasetyo as a speaker. He is director of PT. Energi Agro Nusantara.

Mr. Dimas explained how important feasibility study before we set up a business or plant. Feasibility study can be defined as controlled process for identifying problems and opportunities, determining objectives, describing situations, defininf successful outcomes and accessing the range of cost and benefits associated with several alternatives for solving a problem. It would be determine if a business opportunity is possible, practical, and viable. Also there was a group discussion and financial simulation, so we can understand about: market analysis, technical analysis, law analysis, economic analysis, and managerial. Well, the aim of feasibility study is convincing with reliable information.

For the next workshop, on March 16th 2019. The subtheme is Equipment Design. All event will be held as lecture, discussion grup, or study case session.

AIChEITSSC #1819 #ExpandingExcellence

Categories: Uncategorised

3 Comments

Green Crest CBD Oil Review · 28th June 2019 at 8:25 pm

Just wanna remark that you have a very nice site, I like the
style and design it actually stands out.

Pressure Washer Reviews · 28th June 2019 at 11:38 pm

This is where electricity washers step in to revive the original
great looks in the exterior surfaces. Many times a fairly easy cold water electric pressure washer has a great balance
quite well. Flow minute rates are measured in gallons each and every minute (GPM) and indicates the
quantity of water utilised by industrial pressure washers a single minute.

Simply Restore Skin Cream Ingredients · 30th June 2019 at 1:37 am

This information is priceless. Where can I find out more?

Leave a Reply

Your email address will not be published. Required fields are marked *